Time Lapse and Video

Client: Skanska BAM JV / Severfield

The Ordsall Chord Network Arch being lifted into position .

Client: Severfield

Rotation of the Ordsall Chord Bridge Arches into position for lifting into place.

Client: WPL International 

Installation of a SAF Hybrid Waste Water Treatment System at Ebbesfleet, Kent

Client: Severfield

Installation of two new rail bridges as part of the Ordsall Chord programme of works, Manchester

 

Client: Costain

Video footage of rock netting installation on M12 Smart Motorways verge.

Client: Skanska Bam JV

New footbridge installation over the river Irwell, Manchester

Client: St. Modwen

Kirkby Town Centre Christmas lights switch on stage set up and performance

Client: Costain

M1 J32 Super Span Gantry Lift Aug 16

Client: Costain

Portal gantry lift M1 J29A April 15

Client: Peel Land & Property

Barton Aqueduct Swing Bridge

Client: WPL< INternational

WPL SAF Hybrid Installation, Sandbach, Cheshire